TABLE OF CONTENTS
rules · 1952 · Chandigarh
Parent: The Capital of Punjab (Development and Regulation) Act, 1952 (2969af89c86514ecbcb775420e4ac9a252f61c67)
Text
Rule TOC
1 · TITLE AND EXTENT
2 · SCOPE AND APPLICABILITY
3 · D E F I N I T I O N S
4 · RESIDENTIAL USE
4 · 1 Residential (PLOTTED)
4 · 2 Residential (GROUP HOUSING)
5 · COMMERCIAL USE
5 · 1 Commercial (Governed By Architectural Controls)
5 · 2 Commercial (Governed By Individual Zoning)
5 · 3 Theaters Converted Into Multiplex
5 · 4 Coal Depot and Petrol Pump
6 · INDUSTRIAL USE
7 · PUBLIC/ SEMI PUBLIC BUILDINGS
7 · 1 Cultural and Non Academic Institutional & Religious
7 · 2 EDUCATIONAL INSTITUTES
7 · 3 I.T Park
7 · 4 Railway Station, Chandigarh
8 · 1 Hospital, Commercial, Club
8 · 2 Residential & Government Housing
9 · 1 Transit Oriented Development
1 · 0 M I S C E L L A N E O U S REQUIREMENTS FOR CONSTRUCTION OF ANY BUILDING
10 · 1 General Requirements:-
10 · 2 Gallery Floors and Mezzanine Floor
10 · 3 Damp Proofing of Basement
10 · 4 Drainage of Basement
10 · 5 Fire Protection Requirements
10 · 6 Service Floor
10 · 7 FAR Exemptions
10 · 8 Occupant Load:-
1 · 1 PROCEDURE FOR MAKING APPLICATION FOR APPROVAL OF BUILDING PLAN
11 · 1 APPLICATION FOR APPROVAL
11 · 1.1 Signing of Building Plans
11 · 1.2 Self Certification.
11 · 1.3 Change of Owner / Architect / Structure Engineer During Construction
11 · 1.4 Submission of Revised Building Plans during the Validity Period of Sanction
11 · 1.5 Online Receipt and Approval.
11 · 1.6 Approval of Plans for Buildings of Chandigarh Administration
11 · 1.7 Constructing Building as per Architectural/Frame Control Sheet
11 · 1.8 Deemed Sanction
11 · 1.9 Validity of sanctioned plans
11 · 1.10 Re -Validation of Building Plans
11 · 1.11 Revocation of Sanction
11 · 2 BUILDING DOCUMENTATION PROCEDURES
11 · 2.1 Size of Drawing Sheets and Coloring of Plans
11 · 2.2 Site Plan
11 · 2.3 Clearance Zone for Buildings near High Tension Electrical Line
11 · 2.4 Building Plan
11 · 3 BUILDING PLAN APPROVAL PROCEDURE
11 · 3.1 Maintenance of E -Register for Sanction/ Registration of Building Plans
11 · 3.2 Notice of Commencement of Work
11 · 3.3 Damp Proof Course Certificate
11 · 3.4 Occupation Certificate
11 · 3.5 Procedure for dealing with applications for permission to occupy:-
11 · 3.6 Revocation of Occupation Certificate
1 · 2 MANDATORY PROVISIONS
12 · 1 NORMS FOR DIFFERENTLY -ABLED PERSONS
1 · 2 . 2 PROVISIONS FOR HIGH RISE DEVELOPMENT
12 · 2.1 Definition High Rise
12 · 2.2 Plot Area
12 · 2.3 Means of Access
12 · 2.4 Peripheral Open Spaces Including Set Backs
12 · 2.5 Parking Spaces
12 · 2.6 Building Components
12 · 2.7 Building Services
12 · 3 PUBLIC HEALTH INSTALLATIONS
12 · 4 STRUCTURAL MATERIALS
12 · 4.1 Materials
12 · 4.2 Foundations
12 · 4.3 Building Services
12 · 4.4 Plumbing Services
12 · 4.5 Construction Practices and Safety
12 · 4.6 Damp Proof Course
12 · 4.7 Use of Glass in Buildings to Ensure Human and Fire Safety.
12 · 5 ENVIRONMENTAL CLEARANCE
1 · 3 GREEN BUILDINGS AND SUSTAINABILITY PROVISIONS
13 · 1 Provisions and Applicability
1 · Water Conservation and Management
2 · Solar Energy Utilization
4 · Waste Management
13 · 2 Provisions for City And Site Level Greening
13 · 3 Water Re -Use and Recycling
13 · 4 Installation of Solar Assisted Water Heating System/ Solar Photo Voltaic Power Plant in Buildings
13 · 5 Sustainable Waste Management
13 · 6 Provision of Energy Conservation Building Rule
13 · 7 Suggested Sustainable Building Materials
1 · 4 POWER OF RELAXATION
15 · REPEAL & SAVINGS
2 · I/We attach:
7 · Have you held a licence for doing plumbing work previously in Chandigarh. If answer is "Yes", give particulars of the same in the following form:-
2 · for 1-12 persons
100 · persons
6 · Nil
2 · for persons
1 · for 15 persons
1 · for 1-12
2 · for persons
2 · for 13-25
3 · for 26-40
4 · for 41