No.: JERC-12/2010:- In exercise of the powers conferred by Sections 86 (1) (h) of Electricity Act, 2003 (36 of 2003) and all other powers en
de975d292256de51f67626cf1e897d4ddd9a407c · 2003 · State unknown
Parent: THE ELECTRICITY ACT, 2003 (bea677da57499fcb64c52f6584daa7b9a09b875c)
Text
Rule TOC
1 · 1 Short Title, Extent and Commencement
1 · 2 Definitions
1 · 3 Introduction
1 · 4 Objectives of State Grid Code
1 · 5 Applicability
1 · 6 Implementation of the State Grid Code:
1 · 7 Non - Compliance by User
1 · 8 Code Responsibilities
1 · 9 Confidentiality
1 · 10 Directives
1 · 11 Compatibility with Indian Electricity Grid Code
1 · 12 The Power Department functioning as integrated Utility
2 · 1 Objective
2 · 2 State Grid Code Review Committee
2 · 3 Functions of the State Grid Code Review Committee
2 · 4 Functions of the Protection Coordination Committee
2 · 5 Review and Revisions
3 · 1 Objective
3 · 2 Development of State Transmission System
3 · 3 Planning Policy
3 · 4 Planning Criterion
3 · 5 Planning responsibility
3 · 6 Planning data
3 · 7 Implementation of Transmission Plan
4 · 1 Objective
4 · 2 Procedure for connection to State Transmission System
4 · 3 Rejection of application
4 · 4 Connection Agreement
4 · 5 Site Responsibility Schedule
4 · 6 System Performance
4 · 7 Connection Points / Interface points
2 · Distribution Licensee:
3 · Regional Transmission System:
4 · EHV Consumers and Open Access Customers:
4 · 8 Connectivity of renewable energy generating station to the grid General Conditions for Connectivity of Renewables
4 · 9 Data Requirements:
5 · 1 Objective
5 · 2 Scope
5 · 3 System Security
6 · 1 Objective
6 · 2 Frequency Management
6 · 3 Voltage Management
7 · 1 Objective
7 · 2 General Principles
7 · 3 Protection Coordination
7 · 4 Fault Clearance Times
100 · milliseconds for 400 kV class of voltage
160 · milliseconds for 220 kV, 132 kV and 110 kV class of voltage
300 · milliseconds for 66 kV class of voltage
7 · 5 Generator Requirements
7 · 6 Transmission Line Requirements
7 · 7 Transformer Requirements
7 · 8 Sub-Station Fire Protection
7 · 9 Calibration and Testing
7 · 10 Data Requirements:
8 · 1 Objective
8 · 2 Demand Estimation
8 · 3 Demand Control
8 · 4 Load Crash
9 · 1 Objective
9 · 2 Monitoring of Generation
9 · 3 Monitoring of Drawal
9 · 4 Generating Unit Trippings
9 · 5 Data Requirement
10 · 1 Objective
10 · 2 Outage Planning Process
10 · 3 Annual Outage Planning
10 · 4 Availing of shutdowns schedule
11 · 1 Objective
11 · 2 Contingency Planning Procedure
11 · 3 Restoration Procedure
11 · 4 Special Considerations applicable to contingency planning
11 · 5 Post Disturbance Analysis.
12 · 1 Objective
12 · 2 Designated Persons
12 · 3 Procedure to work on Inter User Boundary Circuits
12 · 4 Special Consideration
13 · 1 Objective
13 · 2 Reportable Events
13 · 3 Reporting Procedure
13 · 4 Reporting Form
13 · 5 Major Failure
13 · 6 Accident Reporting
14 · 1 Objective
14 · 2 General
14 · 3 Generation Scheduling
14 · 4 Drawal Scheduling
14 · 5 Generation Despatch
14 · 6 Responsibilities
14 · 7 Data Requirement
15 · 1 Objective
15 · 2 Scope
15 · 3 Applicability
15 · 4 Type of meters
15 · 5 Standards. -
15 · 6. Ownership of meters
15 · 7 Locations of meters.-
15 · 8 Accuracy Class of meters
15 · 9 Installation of meter
15 · 10 Operation, Testing and Maintenance of meters
15 · 11 Access to meter
15 · 12 Sealing of meters
15 · 13 Safety of meters
15 · 14 Meter reading and recording
15 · 15 Meter failure or discrepancies
15 · 16 Anti-tampering features of meters
15 · 17 Quality assurance of meters
15 · 18 Calibration and periodical testing of meters. –
15 · 19 Data Requirements
16 · 1 This Chapter deals with safety to the working personnel of STU / Distribution Licensee and the Users and maintenance of proper records for the issue of Line Clear Permits for allowing the working personnel to carryout the works.
16 · 2 Safety Standards:
16 · 3 Line Clear Permit (LCP):
17 · 1 This Chapter deals with listing out all the data required to be provided by Users to STU and vice versa, in accordance with the provisions of the State Grid Code.
17 · 2 Responsibility
17 · 3 Data to be registered
17 · 4 Changes in User's Data
17 · 5 Method of Submitting Data
17 · 6 Data not supplied
17 · 7 Special Considerations
18 · 1 Dispute Redressal:
18 · 2 Power to Remove Difficulties:
18 · 3 Power to Relax
18 · 4 Power to Amend
1 · Demand Estimates
1 · METERING