1 · 1 India's National Electricity Plan (NEP) for 2022-32, released by the Central Electricity Authority
1 · 2 The NEP projects a significant rise in pumped storage capacity, from 7.5GW in 2026-27 to 27GW
1 · 3 Among various storage technologies , Pumped Storage Projects (PSP) stands out as a mature and
2 · Definitions:
3 · Objectives:
3 · 1
3 · 2
3 · 3
3 · 4
3 · 5
4 · Policy Validity and Applicability:
5 · Implementing Agency/Nodal Agency:
5 · 1
5 · 2
5 · 3
5 · 4
6 · Classification of Pump Storage Projects:
7 · 1
7 · 1.1 Nomination: The State Govt. may allot projects on nomination basis to CPSUs indicated by
7 · 1.2 Competitive Bidding:
7 · 2 Off-stream closed loop pumped storage project
7 · 2.1 Allocation methodology:
7 · 2.2 Conflict Resolution:
8 · Support and Incentives:
8 · 1
8 · 2
9 · Terms and Conditions of Allotment:
9 · 1
9 · 2
10 · Facilitation Charges:
11 · Time Limit for Executing Project:
11 · 1 The Developer shall commit and adhere to project execution timelines to complete the
11 · 2
11 · 3
11 · 4
11 · 5 The Developer may surrender the allotment back to State Govt., if on completion of the Detailed
12 · Period of Allocation:
12 · 1 The Pumped Storage Projects shall be offered for a maximum period of forty-five (45) years from
12 · 2 The project assets would be maintained by the successful Developer in a condition that would
12 · 3
12 · 4 If such inspections find that the plant capacity and/or life are being undermined by inadequate
13 ·
13 · 1 Where the Developer wishes to connect to the State Transmission Utility (STU), Bihar State Power
13 · 2 The Developer shall lay the network infrastructure from the PSP site to the grid connectivity point
13 · 3 If any new EHV substations and transmission lines or strengthening of existing transmission system
14 ·
14 · 1 Project transfer is allowed after project commissioning as per the norms and procedures adopted
14 · 2 Pre-commissioning transfer is allowed if:
15 ·
15 · 1 Compliance with regard to selection of developer on nomination as well as through tender process
15 · 2 integration with the Bihar Purchase Preferential Policy 2024 & its amendments if any, will be
16 ·
16 · 1 In the event of any dispute or differences arising in relation to the interpretation, development or
16 · 2 Appellate Forum:
17 ·
200 · (two hundred) copies of the published gazette to Energy Department, Bihar, Patna.