REAL ESTATE REGUULATORY AUTHORITY , PUNJAB GROUND FLOOR, PUNJAB MANDI BHAWAN; SECTOR 65, S.A.S.NAGAR- 160062
regulations · 2016 · State unknown
Parent: The Real Estate (Regulation and Development) Act, 2016. (2016) (5d73f769bab287bc9d9fbab2632d34a0b3163e2a)
Text
Rule TOC
12 · (a
17 ·
20 ·
23 ·
25 · .
27 ·
28 ·
31 · (a)
33 ·
35 ·
36 ·
37 ·
2 · 3_
7 · _
10 ·
11 ·
12 ·
13 ·
14 ·
1 · The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate /Completion Certificate. 2 Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer: In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer; who is responsible for the quantity calculated should be mentioned at the place marked 3 The estimated cost includes all labour, material, equipment and machinery required to carry out entire work: 4 As this is an estimated cost, any deviation in quantity required for development of the Real estate Project will result in amendment of the cost incurred/to be incurred: 5_ All components of work with specifications are indicative and not exhaustive
2 · Following technical professionals are appointed by Owner Promoter (i) Mls/Shri/Smt as LS. Architect
2 · Whether he is party to the case or he is the authorised representative of any party. [Furnish necessary particulars]
3 · Details of papers/documents sought to be inspected copies required
4 · Date and duration of the inspection sought
5 · The amount of fee payable (as per relevant Regulations) and the mode of payment Place: Date Signature