Roop's Law Assist
Waitlist

CENTRAL ELECTRICITY AUTHORITY

3c7e1cf91399a8ab4cbd5c370cdbfc13b34e1bae · 2003 · State unknown

Download PDFParent ActBack to Subordinates
Parent: THE ELECTRICITY ACT, 2003 (bea677da57499fcb64c52f6584daa7b9a09b875c)

Text

CENTRAL ELECTRICITY AUTHORITY NOTIFICATION New Delhi, the10th April, 2007 F.No. CEA/PLG/LF/9/40/07. --Whereas the draft of the Central Electricity Authority (Furnishing of Statistics, Returns and Information) Regulations, 2006 were published, as required by Sub-section (3) of Section 177 of the Electricity Act, 2003 (36 of 2003), read with rule 3 of the Electricity (Procedure for Previous Publication) Rules, 2005; Now, therefore, in exercise of the powers conferred by Section177, read with Section 74 and clause (i) of Section 73 of the Electricity Act, 2003, the Central Electricity Authority hereby Makes the following regulations, namely:- _________________________________ ______________________________ CENTRAL ELECTRICITY AUTHORITY (FURNISHING OF STATISTICS, RETURNS AND INFORMATION) REGULATIONS, 2007. Short title and commencement - (1) These regulations may be called the Central Electricity Authority (Furnishing of Statistics, Returns and Information) Regulations, 2007. These regulations shall come into force on the date of their publication in the official Gazette. Definitions - unless the context otherwise requires, in these regulations,- “Act” means the Electricity Act, 2003 (36 of 2003); "Voltage" means the difference of electric potential measured in volts, between any two conductors or between any part of either conductor and the earth as measured by a suitable voltmeter and is said to be – (a) "high voltage" where the voltage exceeds 650 volts but does not exceed 33000 volts under normal condition; and (b) "extra high voltage" where the voltage exceeds 33000 volts under normal condition; All other words and expressions used and not defined in these regulations but defined in the Act shall have the meanings respectively assigned to them in the Act. Applicability

Rule TOC

107 · THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
108 · THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
110 · THE GAZ
31 · 03.20..
111 · THE GAZ
112 · THE GAZ
113 · THE GAZ
61 · Y Y
118 · THE GAZETTE OF INDIA: EXTRAORDINARY
119 · THE GAZETTE OF INDIA: EXTRAORDINARY
120 · THE GAZETTE OF INDIA: EXTRAORDINARY [PART III – SEC.4]
121 · THE GAZETTE OF INDIA: EXTRAORDINARY
122 · THE GAZETTE OF INDIA: EXTRAORDINARY
123 · THE GAZETTE OF INDIA: EXTRAORDINARY
124 · THE GAZETTE OF INDIA: EXTRAORDINARY
400 · kV,220kV,132kV,110kV,78kV,66kV,33kV
125 · THE GAZETTE OF INDIA: EXTRAORDINARY
126 · THE GAZETTE OF INDIA: EXTRAORDINARY
127 · THE GAZETTE OF INDIA: EXTRAORDINARY
1 · EHV Lines: above
2 · 500 kV DC lines 3. 400 kV 4. 230 kV 5. 220kV 6. 132 kV 7. 110 kV 8. 78 kV 9. 66 kV 10. 33 kV 11. 22 kV 12. 11 kV 13. 6.6 kV 14. 4.4 kV 15. 3.3 kV 16. 2.2 kV 17. 440/230 V, 3
18 · * Direct current
19 · Any other
128 · THE GAZETTE OF INDIA: EXTRAORDINARY
7 · Public Water works & Sewage disposal
10 · Entities within State/U.T (Entity wise)
11 ·
4 · .
8 · .
8 · . Any other category
9 · Pvt. Licensees* (Licensee wise)
10 ·
12 ·
129 · THE GAZETTE OF INDIA: EXTRAORDINARY [PART III – SEC.4]
130 · THE GAZETTE OF INDIA: EXTRAORDINARY [PART III – SEC.4]
1 · Managerial and higher executives: A
2 · Technical and scientific offi may be included.
3 · Non-Technical : All regular non-tec ant Controller engaged at
5 · a) Technicians and operation staff : Al stations.
1 · 2 3 4 5 6 7 8 9 10 11 12
132 · THE GAZETTE OF INDIA: EXTRAORDINARY
133 · THE GAZETTE OF INDIA: EXTRAORDINARY
1 · Installations of suppliers of electricity including SEBs/Licensees/Generating Companies: (a) Generating Station (b) Transmission System (Lines, sub-stations, towers, etc.) (c) Distribution system (Lines, sub-stations, pole
2 · Installations of industrial consumers: (a) Owned by Govt./Semi -Govt. bodies/local authorities. (b) Owned by private companies
3 · Installations of consumers other than industrial consumers e.g. domestic/agriculture/commercial consumers, etc.: (a) Owned by Govt./Semi Govt. bodies/
134 · THE GAZETTE OF INDIA: EXTRAORDINARY
7 · Maximum Electricity Demand (Previous Year)
8 · Electricity Consumption (Previous Year)
9 · Production – Previous Year
12 · Details of Captive Electricity Generating Plants.
12 · 1
12 · 2Other data :
13 · Energy Conservation:
145 · THE GAZETTE OF INDIA: EXTRAORDINARY
146 · THE GAZETTE OF INDIA : EXTRAORDINARY
50 · 00 Hz Demand Met Time (Hrs)
2 · B. State Demand (MW)
1 · Regional Availability/ Demand/ Shortage
2 · A. State Requirement (Net Energy - MkWh)States Thermal Hydro
147 · THE GAZETTE OF INDIA : EXTRAORDINARY
3 · Inter-Regional Exchanges - Physical Flows [Import(+)/ Export(-)]
5 · Frequency Profile
6 · Voltage Level at Critical Sub-Stations
400 · kV
4 · Short-Term Open Access Transaction for the Previous Day (MkWh)
148 · THE GAZETTE OF INDIA : EXTRAORDINARY
7 · Major Reservoir Particulars
8 · Grid Disturbance/ Significant Events (If Any)9. System Constraints (If Any)
10 · Weather Conditions Prevailed on the Day of Report & for the Following Day:11. Generating Units Outage Status in ____________________ RegionAs on Date Time 6:00 Hours11A. Generating Units Revived During Last 24 Hrs. ( 06:00 Hrs of (Date) to 06:00 Hrs
11B · Generating Units Under Outage (Status at 06:00 Hrs of (Date))
149 · ZETTE OF INDIA : EXTRAORDINARY
12 · Transmission Lines Outage Status in Southern Region
1 · 2.3.4.
1 · 2.3.4.
12 · B. Transmission Lines Under Outage (Status at 06:00 Hrs of (Date))
1 · 2.3.4.
1 · 2.3.4.
1 · Own Generation
2 · Dedicated Power Stations#
2 · 12.2
4 · Total Availability
6 · Shortage (5-4)
7 · % Shortage [{(5-4)/5}*100]
1 · Availability
2 · Frequency Correction
49 · 0 Hz
49 · 5 Hz
1 · Peak Demand2 Demand Met
3 · Date & Time of Peak Demand Met4 Frequency Correction
6 · Power Cuts7 Shortage8 % Shortage
5 · Unrestricted Requirement (1+2+3+4)
1 · Own Generation
2 · Dedicated Power Stations#
2 · 1
2 · 2
3 · Share from Shared Projects
4 · Bilateral Import
5 · Bilateral Export
7 · Total Availability (1+3+6)
9 · Shortfall
1 · Intra-Regional Bilateral Transactions (Scheduled Drawl)
2 · Inter-Regional Bilateral Transactions (Scheduled Drawl)
159 · THE GAZETTE OF INDIA : EX
1 · Effective Capacity for the Year 20__-20__
2 · Maintenance Schedule for the Year 20__-20__
4 · Monthl
3 · Addition in Installed Capacity (MW)
1 · Station 12 Station 2
1 · of 2
5 · Monthly Estimated Peak Demand (MW) (max.) and Average Energy Requirement (MkWh/day) of Constituents for the Year 20__-20__
6 · Share of States/ UTs in the Central Sector Generating Stations (MW)
7 · Firm power import/export bilateral agreement/arrangements with other constituents
160 · THE GAZETTE OF INDIA : EXTRAORDINARY
8 · Monthly anticipated water levels and energy content for the Year 20__-20__
9 · Energy Availability Calculation of the State/ System/ Region (MkWh)
10 · Peak Availability of the State/ System/ Region (MW)
12 · State wise Anticipated Peak Demand Vs Peak Availability for the Year 20__-20__
11 · State wise Anticipated Energy Requirement Vs Energy Availability (MkWh) for the Year 20__-20__
162 · THE GAZETTE OF INDIA
165 · THE GAZETTE OF INDIA: EXTRAORDINARY [PART III – SEC.4]
1500 · Hrs.
166 · THE GAZETTE OF INDIA: EXTRAORDINARY
1 · 2 3 4 5
176 · THE GAZETTE OF INDIA: EXTRAORDINARY
3 · 4 5 6 7
1 · 2
2 · 3 4 5 6 7
175 · THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC
1 · 2 3 4 5 6 7 8 9 10 11 12 13 14
176 · THE GAZETTE OF INDIA: EXTRAORDINARY
3 · 4 5 6 7
1 · 2
177 · THE GAZETTE OF INDIA: EXTRAORDINARY
1 · 2 3 4 5 6 7
178 · THE GAZETTE OF INDIA: EXTRAORDINARY [PART III – SEC.4]
5000 · to
9999 · persons
2000 · to
4999 · persons
500 · persons
179 · THE GAZETTE OF INDIA : EXTRAORDINARY
11 · kV Feeder Metering
180 · THE GAZETTE OF INDIA: EXTRAORDINARY
1 · Distribution Transformer Failure
2 · Power Transformer Failure
181 · THE GAZETTE OF INDIA : EXTRAORDINARY
1 · 2 3 4 5 6 7 8 9 10 11 12 13 14
182 · THE GAZETTE OF INDIA
1 · 2 3 4 5 6 7 8 9 10 11 12 13 14
185 · THE GAZETTE OF INDIA : EXTRAORDINARY
2 · 0 Desi
186 · THE GAZETTE OF INDIA : EXTRAORDINARY
1234 · 5 6 7 8 9
1 · 0 General:
3 · 0 O
1 · 2 3 4 5 6 7 8 9 11 12
1 · 0 General:
3 · 0 Operational Performance Data For The Station For The Year :
187 · THE GAZETTE OF INDIA : EXTRAORDINARY
2 · 0 Design parameters for the Station:
1 · 234 5 6 7
1 · 2 3 4 5 6 7 8 9 10 11 12
24 · HOURS WEIGHTED AVERAGE
1 · Length of Lines
400 · KV (400 / 220 KV )
220 · KV ( 220 /132 KV )
3 · Service Failure
1 · to 10%
4 · Transmission Losses (Technical)
1 · Revenue Income
2 · Revenue Expenditure
1 · Energy Purchased
2 · Units (Energy) Billed
3 · Realised Units
4 · Distribution Losses
5 · Details of Energy Consumption
1 · 2
4 · 56
7 · 8
6 · Average waiting period for obtaining new connection
7 · Length of EHT lines……..……………………..CktKm.
8 · Availability of distribution Net work (%) =(Nos. of hours for which network was available/Total no. of hours) x 100
1 · Revenue Income
2 · Revenue Expenditure
3 · Profit / (Loss) (before Tax)
4 · Sources of Fund
5 · Application of Funds
6 · Investment during the year
7 · Details of assets created during the year
8 · Electricity Duty/ Taxes
9 · Fuel Cost Adjustment
10 · Total Number of Employees
11 · Persons Trained during the year Nos.
1 · APRIL2 MAY3 JUNE4 JULY5 AUGUST6 SEPTEMBER7 OCTOBER8 NOVEMBER
9 · DECEMBER
10 · JANUARY11 FEBRUARY12 MARCH
1 · 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16