MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE NOTIFICATION
c473175127b5b3d86c935f0d9f8c79318310e551 · 1986 · State unknown
Parent: THE ENVIRONMENT (PROTECTION) ACT, 1986 (018afec0d2f70a0c9774147226d14996ced132c4)
Text
Rule TOC
3 · . Prohibited activities within ICRZ.- The following activities shall be prohibited, in general, within the entire ICRZ. Exceptions to these and other permissible or regulated activities in specific ICRZ categories viz. ICRZ-I, II, III & IV, shall however be governed by the provisions under para 5 of this Notification:
4 · Regulation of permissible activities in the ICRZ
5 · Island Coastal Regulation Zone Plan (ICRZP):
6 · Areas requiring special consideration: Small Islands of Andaman Islands and Nicobar and Lakshadweep:
7 · ICRZ clearance for permissible or regulated activities- Delegations
8 · Procedure for ICRZ clearance for permissible and regulated activities:
9 · Enforcement of the ICRZ Notification:
1 · General measures
1 · ICRZ-II
2 · ICRZ-III
1 · Demarcation of High Tide Line and Low Tide Line
2 · Hazard Line:
3 · Preparation of ICRZ Maps
3 · Local level ICRZ Maps
4 · Classification of ICRZ areas
5 · Public consultations on the ICRZ Plans
6 · Revision of ICRZ Plans
1 · PROJECT DETAILS
2 · BENEFITS OF THE PROJECT
3 · DESCRIPTION OF THE PROJECT UNDER CONSIDERATION (Select the Category of the project):
5 · CLAUSE OF IPZ NOTIFICATION UNDER WHICH PROJECT IS A PERMISSIBLE /REGULATED ACTIVITY
6 · MANDATORY FIELDS FOR PROJECT ASSESSMENT
7 · PROJECT LOCATED IN (Select Type)
8 · DETAILS OF FOREST/ MANGROVES LAND INVOLVED (YES/NO)
9 · DISTANCE OF PROPOSED PROJECT FROM ESA/MARINE PARK/ WILD LIFE SANCTUARY
10 · NOC OR CONSENT TO ESTABLISH FROM STATE/UT POLLUTION CONTROL BOARDS OBTAINED (YES/NO)
11 · EIA studies (relevant fields to be filled)
12 · DISASTER MANAGEMENT PLAN / NATIONAL OIL SPILL DISASTER CONTINGENCY PLAN (if applicable)
13 · PROJECT INVOLVING DISCHARGE OF LIQUID EFFLUENTS:
14 · PROJECT INVOLVING DISCHARGE OF SOLID WASTE:
15 · WATER REQUIREMENT (KLD)
16 · DETAILS OF WATER TREATMENT AND RECYCLING (If any) (Multiple Entries Allowed)
17 · DETAILS OF RAINWATER HARVESTING
18 · ENERGY REQUIREMENT AND SOURCES
19 · ENERGY EFFICIENCY/SAVING MEASURES
20 · RECOMMENDATION OF STATE /UT COASTAL ZONE MANAGEMENT AUTHORITY
24 · ADDITIONAL INFORMATION, If any