REGISTERED NO. PT-40
regulations · 2003 · State unknown
Parent: THE ELECTRICITY ACT, 2003 (bea677da57499fcb64c52f6584daa7b9a09b875c)
Text
Rule TOC
10 ·
12 ·
14 ·
15 ·
16 ·
23 · .
24 · Regulatory Asset In extraordinary circumstances, the Commission may allow creation of regulatory Asset in case the Revenue gap is very substantial and is on account of one-time factor beyond the control of the integrated utility or generating company or the licensee and its full recovery in a single year will result in tariff shock to consumers_ The Regulatory Asset so created along with carrying cost shall be liquidated in a maximum of 3 years' period immediately following the year in which it is created: 25. Tariff of Electricity Trader (1) The Commission shall approve the tariff for Power Purchase and procurement by the Distribution licensee from the Electricity Trader: On such approval by the Commission, the Electricity Trader shall be entitled to sell electricity to the Distribution licensee subject to the terms and conditions of the Power Purchase Agreement approved by the Commission: (2) The Commission shall, from time to time, fix the trading margin of the Electricity Trader for intra state trading in electricity in the State of Bihar. The sale of electricity by the Electricity Trader shall be subject to such further terms and conditions as may be laid down by the Commission for the purpose from time to time. 26. Generation Tariff 1) The Commission may approve the tariff for the power purchase except central sector and procurement by the Distribution licensee from the integrated utility or a generating company. On such approval by the Commission, the integrated utility or the generating company shall be entitled to sell the energy to a Distribution licensee as per the tariff and the terms and conditions contained in the Power Purchase Agreement approved by the Commission. (2) In cases, other than those covered under clause (1) above, the integrated utility or a generating company may file an application before the Commission for determination of tariff for electricity generated by it for the sale of electricity in the State of Bihar giving details of the fixed and variable costs associated with the generation. (3) The application by an integrated utility or a generating company under clause (2) above may be filed for determination of tariff for sale of electricity to any specific purchaser, including Distribution Licensee or to more than one purchaser or for general sale who may desire to purchase from it.
34 · Capital Cost Subject to prudent check by the Commission, the actual expenditure incurred on completion of the project shall form the basis for the determination of final tariff: The final tariff shall be based on the admitted capital expenditure actually incurred upto the date of commercial operation of the generating station and shall include capitalised initial spares subject to following ceiling norms as a percentage of the original project cost as on the cut off date: Coal based lignite fixed generating station 2.5% (ii) Gas turbine combined cycle generating station 4.0%/
36 ·
49 · 84 49.82 49.80 49.78
49 · 82 49.80 49.78 49.76
204 · 0 210.0 219.0 228.0
49 · 04 49.02
49 · 02
561 · 0 570.0
44 ·
49 ·
50 ·
52 ·
54 ·
55 ·
56 ·
57 · .
58 ·
59 ·
49 · 84 49.82 49.80 49.78
49 · 82 49.80 49.78 49.76
204 · 0 210.0 219.0 228.0
49 · 04 49.02
49 · 02
561 · 0 570.0
60 ·
65 ·
66 ·
67 · .
68 ·
69 ·
70 ·
73 ·
3 · Substituted Regulation 73(2)(c)i) by the BERC (Terms and Conditions for Determination of Tariff) [2nd Amendment] Regulations, 2014 vide Bihar Gazette No. 324 dated 27th March, 2014 (W.e.f: 27.03.2014)
4 · Added at the end of Regulation 73(3)(b) by the BERC (Terms and Conditions for Determination of Tariff) [2nd Amendment] Regulations, 2014 vide Bihar Gazette No. 324 dated 27th March, 2014 (w.e.f: 27.03.2014)
74 ·
75 ·
76 ·
5 · Substituted Regulation 73(4)(ii) by the BERC (Terms and Conditions for Determination of Tariff) [2nd Amendment] Regulations, 2014 vide Bihar Gazette No_ 324 dated 27th March, 2014 (w.e.f: 27.03.2014)
77 · .
78 ·
6 · Appended under Regulation 21(1) by the BERC (Terms and Conditions for Determination of Tariff) [1 st Amendment] Regulations, 2012 vide Bihar Gazette No. 452 dated 3rd September, 2012 (w.e.f: 03.09.2012)
1 · 1 1.2 13
2 · Calculation Of Rate of Energy Charge(Rs /kWh)'
3B · The total energy charge shall be worked out based on ex-bus energy scheduled to be sent out in case of plants covered by ABT; and ex-bus energy sent out in case of plants not covered by ABT, as the case may be.
3C · Any escalation in fuel cost to be considered for subsequent years or FPA to take care of the escalation:
1 · 0
2 · 0
2 · 1 2.2 2.3 2.3
3 · 12 2.3.13 2.3
2 · 4 2.4 2.4.2 2.4.3 2.4.4 2.4.5 2.4.6
2 · 5
2 · 6 2.6 2.6_
3 · 0 4.0 4.1 4.2 4.3 4.4 45 4.6 47 4.8 4.9 4.10 4.11 4.12 4.13 4.14 4.15
5 · 0
7 · 0
8 · 0
1 · 0 ICost of Land & Site Development 1.1 Land 1.22 Rehabilitation & Resettlement (ReR) 13 Preliminary Investigation & Site development ITotal Land & Site Development 2.0 PPlant & Equipment 2.1 FSteam Turbine_generator Island 2.2 [Turbine Generator Island 2.3 WHRB Island 2.4 BOP Mechanical 2.4.1 Fuel Handling & Storage system 2.4.2 External water supply system 2.4.3 IW system 2.4.4 ECooling_Towers 2.4.5 DM water Plant 2.4.6 IClarification plant 2.4.7 kChlorination Plant 2.4.8 HAir condition & Ventilation System 2.4.9 FFire Fighting system 2410 HPILP Piping [Total BOP Mechanical 2.5 BBOP Electrical 2.5.1 ISwitch Yard Package 2.5.2 Transformers package 2.5.3 ISwitch gear Package 2.5.4 Cable Cable Facilities & grounding_ 2.5,5 [ighting 2.,5.6_Emergency D.G set TTotal BOP Electrical 2.6 Package TTotal Plant Equipment excluding taxes [Duties 2.7 Taxes and Duties 2.7.1 [Custom Duty 272 pOther Taxes & Duties Total Taxes & Duties Fotal Plant & Equipment 3.0 IInitial spares 4.0 ICivil Works 4.1 MMain plantIAdmBuilding 4.2 External water supply system 43 ICW system 4.4 ooling_Towers 45 DMwater Plant 4.6 IClarification plant 4.7 Fuel Handling & Storage system 4.8 FTownship & Colony 4.9 [empconstruction & enabling_works 4.10 Road & Drainage 4.11 Fire Fighting system Fotal Civil works
5 · 0 IConstruction & Pre- Commissioning Expences 5. Erection Testing and commissioning 52 [Site supervision 53 pperator's Training_ 5.4 IConstruction Insurance 5.5 Tools & Plant 5.6 IStart up fuel TTotal Construction Pre- Commissioning EExpences 6.0 JOverheads Establishment 6.2 Design & Engineering_ 6.3 Audit & Accounts 6.4 [Contingency ITotal Overheads
7 · 0 [Capital cost excluding IDC & FC _ 7.1 Interest During Construction (IDC) 7.2 FFinancing Charges (FC) 8.0 ICapital cost including IDC & FC Note: 1. In case of time & Cost over run, a detailed note giving reasons of such time and cost over run should be submitted and clearly bring out thel agency responsible and whether such time & cost over run was beyond the control of the generating company_ Applicant
3 · 1 10 18 19 20 21 22 23 25 26 27 28 29 30 31 32 [OTAL WWeighted Average Depreciation Rate %
1 · 2
1 · 3
1 · 4
1 · 222
2 · 1
2 · 2
2 · 3
2 · 4
2 · 2
11 · 12
83 · Dam Type Maximum dam height
10 · Power House Type Installed capacity (No of units X MW) Peaking capacity during lean period (MW) Type of turbine_ Rated Head(M) Rated Discharge(Cumecs
11 · Tail Race Tunnel Diameter, shape Length Minimum tail water level
412 · Switchyard [ype of Switch gear No.of generator bays No. of Bus coupler bays No: of line bays Note: Specify limitations on generation, if any, during specific time period on water use due to irrigation, drinking water, industrial, environmental considerations etc_
1 · 0 Infrastructure Works 1.1 Preliminary_including Development 1.22 Land 1.3 Buildings 1.4 Township 1.5 Maintenance 1.6 Tools & Plants 1.77 Communication 1.8 Environment & Ecology 1.9 Losses on stock 1.10 Receipt & Recoveries 1.11 Total (Infrastructure works 2.0 Major Civil Works 2.1 Dam,Intake & Desilting Chambers_ 2.2 HRT, TRT,Surge Shaft & Pressure shafts 2.3 Power Plant civil works 2.4 Other civil works (to be specified) 2.5 Total (Major Civil Works 3.0 Hydro Mechanical equipments 4.0 Plant & Equipment 4.1 Initial spares of Plant & Equipment 4.2 Total Plant & Equipment) 5.0 Taxes and Duties 5.1 Custom Duty_ 5.2 Other taxes & Duties 5.3 Total Taxes & Duties 6.0 Construction & Pre-commissioning expenses 6. Erectiontesting & commissioning 6.2 Construction Insurance 6.3 Site supervision 6.4 Total Const. & Pre-commissioning) 7.0 Overheads Establishment 7.2 Design & Engineering 7.3 Audit & Accounts 7.4 Contingency 7.5 Rehabilitation & Resettlement 7.6 Total (Overheads_ 8.0 Capital Cost without IIDC & FC 9.0 Financing charges (FC) 10.0 Interest during construction (IDC) 11.0 Capital Cost with IDC & FC
1 · Separate statements of Additional Capitalisation for (1) after COD and upto Cut off date; and (2) beyond cut off date are to be furnished: 2. In case of the project has been completed and any tariff notification(s) has have already been issued in the past by Govt: of India or any other authority, fill column 6 giving the cost as admitted for the purpose of tariff notification already issued by (Name of the authority) Enclose copy of the tariff Order)
2 · In case initial spares purcahsed alongwith any equipment then the cost of such spares should be indicated separately,e.g: Rotor- 50 Crs. Initial spares 5 Crs.etc.
2006 · 07
3 · 1 10 18 19 20 21 22 23 25 26 27 28 29 30 31 32 [OTAL WWeighted Average Depreciation Rate %
0 · & Mexpenses Maintenance Spares__ Recievables
1 · 2
1 · 3
1 · 4
1 · 222
2 · 1
2 · 2
2 · 3
2 · 4
2 · 2
3 · 4
1 · 3 2.0 2 2.2 2.3 2.4 2.5 2.6
2 · 8 2.9
3 · 0 3 3.2
8 · 0 8.1 8.2 8.3
9 · 0
2 · 3 4
2 · 3 4
10 · & Mexpenses 2Maintenance Spares 31 Recievables Total Working Capital_ Rate of Interest Interest on Working Capital_
1 · 1.1 Foreign Loan Draw down Amount IDC Financing charges
13 · Foreign_Loan 3 Draw down Amount IDC Financing_ charges_
1 · 1.4
1 · Total Foreign Loans Draw down Amount_ IDC Financing charges
12 · ndian Loans
1 · 2. Indian Loan Draw down Amount IDC Financing charges
12 · 2undian Loan 2 Draw down Amount IDC Financing charges
12 · 3 Indian_Loan 3 Draw down Amount_ IDC Financing charges
2 · 1 Foreign equity drawn
2 · 2 Indian equity drawn
132 · KV/33 KV AC Sub-Station
7 · Appended under Regulation 73(2)(c)(i) by the BERC (Terms and Conditions for Determination of Tariff) [2nd Amendment] Regulations, 2014 vide Bihar Gazette No. 324 dated 27th March, 2014 (W.e.f: 27.03.2014)