177 · of the Electricity Act, 2003 (36 of 2003), read with rule 3 of the/Electricity
2 · Definitions.- (1) In these regulations, unless the context otherwise requires,-
220 · kV and above (132 kV and above in the case of North-Eastern Region);
1 · 5%
765 · and 400
33 · to132
765 · and 400
220 · and 132
1 · 0
1 · 5
2 · 0
1 · 5
2 · 5
2 · 0
33 · to 132
5 · 0
3 · 0
10 ·
11 ·
12 · Reporting of events affecting grid operation.- (1) Any tripping of
13 ·
14 · Restoration of grid following grid incident and grid disturbance.- (1)
15 · Operational Data during normal operation and during grid incidents and
16 · Operational Data Records.- (1) Operational data including equipment and
17 ·
18 · Safety Procedure.- (1) The Entity shall prepare contingency procedures for
19 · Maintenance of Tools and Equipment.- The maintenance staff shall be
20 ·
21 ·
22 ·
220 · kV lines through the use of Emergency Restoration System in order to
23 · Inspection and Patrolling.- (1) All essential parameters, which indicate the
24 · Maintenance schedules.- (1) Entities shall identify critical equipment and
25 · Use of diagnostic techniques for condition monitoring of equipment.-
26 ·
27 ·
28 ·
29 ·
30 ·
31 ·
32 · Maintenance records.- The records of all maintenance carried out for each
33 ·