REGISTERED NO. PT-40
regulations · 2003 · State unknown
Parent: THE ELECTRICITY ACT, 2003 (bea677da57499fcb64c52f6584daa7b9a09b875c)
Text
Rule TOC
21 ·
10 ·
12 ·
15 ·
16 ·
17 ·
18 · (a)Whether Applicant himself shall be financing the proposed transmission of electricity fully on its own balance sheet
19 ·
20 ·
21 ·
22 ·
23 ·
1 · 1
1 · 2
1 · 3
1 · 4
2 · 1
2 · 2
3 · 1
3 · 2
8 · 1
8 · 2
8 · 3
8 · 4
8 · 5
8 · 6
8 · 7
8 · 11
8 · 12
9 · 1
9 · 2
9 · 3
9 · 4
9 · 5
9 · 6
9 · 7
10 ·
10 · 1
12 · 2
12 · 3
12 · 4
12 · 5
12 · 7
13 ·
13 · 1
13 · 2
14 · 1
14 · 2
14 · 3
14 · 5
15 ·
16 ·
16 · 1
16 · 2
16 · 3
16 · 4
17 ·
18 ·
19 · 4
19 · 9
19 · 11 The Licensee shall within 3 months of the end of each financial year; submit to the Commission a report indicating the performance of the Transmission System during the previous financial year The Licensee shall, if required by the Commission, publish summary of the report in a manner to be determined by the Commission 20. Compliance with Grid Code by the Transmission Licensee 20.1 The transmission license shall ensure due compliance with the Indian Electricity Grid Code and Bihar State Electricity Grid Code. 20.2 The Commission may; on reasonable grounds and after consultation with the affected Generation Company, Transmission Licensee the State Transmission Utility the State Load Despatch Centre and electricity traders, issue direction relieving the licensee of its obligation in respect of such parts of the State Grid Code and to such extent as may be decided by the Commission: 21. Central Scheduling and Despatch 21.1 Having regard to information provided to it by Suppliers. Generating Companies Central Transmission Utility Distribution Licensees and other utilities in the region (including information as to forecast levels of electricity demand and availability of generation capacity) and keeping into consideration requirements of the Transmission Planning and Security Standards and the Transmission operating Standards referred to in this Licence, the Licensee shall undertake operational planning matching to possible output of all Generating Sets contracted to it and any other Bulk Supply and other sources or electrical energy connected to the Licensee'$ Transmission System (including reserve of generation to provide security margin O generation availability) with forecast demand after taking into account, inter alia: unavailability of Generating Sets; and constraints from time to time imposed by technical limitations on the Total System or interconnections with other transmission systems O any part(s) thereof; consistent with this condition 21.1 and in accordance with the Grid Codes, for the removal from service of parts of the transmission systems for maintenance, repair extension of reinforcement. 21.2 Taking account of the factors referred to in condition 21.2 the Licensee shall schedule and issue direct instructions for despatch of power from the Generating Sets and other sources of power as are at such times available to generate electricity and which are subject to despatch instructions in ascending order of relevant prices that are offered for the generation of electricity into the Total System, keeping in view the constraints on hydro-electric generation, and as will in aggregate (and after taking account of electricity delivered to Or from the Total System from or to other sources) be sufficient to match at all times (to the extent possible having regard to the availability of Generation sets) expected demand, taking account of information provided by Suppliers, the Central Transmission Utility and the Regional Electricity Board together with an appropriate margin of reserve. 21.3 The factors referred t0 in condition 21.2 include:
22 · 3
22 · 4
22 · 5
23 ·
23 · 4
24 ·
24 · 1
24 · 2
25 ·