No.: JERC-11/2010:- In exercise of power conferred by Section 181 (1) and 181 (2) read with Section 50 and 43 (1), Section 44, Section 46, S

3ee25a0e0e650dc216f5e353542a69912bcaf795 · 2003 · State unknown

Download PDFParent ActBack to Subordinates
Parent: THE ELECTRICITY ACT, 2003 (bea677da57499fcb64c52f6584daa7b9a09b875c)

Text

No.: JERC-11/2010:- In exercise of power conferred by Section 181 (1) and 181 (2) read with Section 50 and 43 (1), Section 44, Section 46, Section 47 (4) Section 56 of Electricity Act, 2003 (36 of 2003) and all powers enabling it in this behalf and also in compliance of the Ministry or Power, Govt. of India's (i) notification no. SO 790 (E) dated 8 th June 2005 issuing "Electricity (Removal of difficulties) Order 2005" for "Inclusions of measures to control theft of electricity in Electricity Supply Code", and (ii) notification no. SO 798 (E) dated 9 th June, 2005 issuing Electricity (Removal of Difficulties) Eight Order, 2005 for obtaining supply of electricity at single point from the distribution licensee by the Cooperative Group Housing Societies or by any person for their members or employees residing in the same premises, the Joint Electricity Regulatory Commission for the State of Goa and Union Territories hereby makes the following Regulations on Electricity Supply Code governing supply of electricity by the licensees and procedure thereof, the powers, functions, and obligations of the licensees and the rights and obligations of the consumers and other matters connected therewith and incidental thereto. CHAPTER – 1: GENERAL 1.1 Short Title, Extent and Commencement These Regulations may be called the "Joint Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2010". These Regulations shall come into force from the date of its publication in the official gazette. These Regulations shall extend to the whole State of Goa and Union Territories of Andaman & Nicobar Islands, Chandigarh, Dadra & Nagar Haveli, Daman & Diu, Puducherry and Lakshadweep. These Regulations shall apply to all distribution licensees and the consumers of electricity. 1.2 Defi

Rule TOC

1 · 1 Short Title, Extent and Commencement
1 · 2 Definitions
1 · 3 Review of the Electricity Supply Code
2 · 1 System of Supply
2 · 2 Voltage of Supply to Consumers
2 · 3 Classification of Consumers
3 · 1 Licensee's obligation to supply of electricity on request
3 · 2 Exceptions from duty to supply of electricity
3 · 3 Licensee's obligation to extend the Distribution System
3 · 4 Service connection / extension work got done by consumers
3 · 5 New Connection
3 · 6 Supply to Different Categories of Consumers
3 · 7 Target Period of Completion of Various Activities
3 · 8 The licensee shall maintain a priority register in respect of the following categories
3 · 9 The Commission may for reasons to be recorded, direct / permit deviations from the above Regulation 3.1 to 3.8 if in the opinion of the Commission the circumstance warrants such deviation. The Commission may issue such direction / permission by an order to the licensee.
4 · 1 Wiring at Consumer's Premises
4 · 2 General Wiring Conditions
4 · 3 Apparatus Interfering with Licensee's System
4 · 4 A.C. Motor Installations
4 · 5 Consumer's Apparatus
4 · 6 Power Factor of Plant and Apparatus
4 · 7 High Tension Consumers
4 · 8 Extra-High Tension Consumer
4 · 9 HT/ EHT Consumers
4 · 10 Inspection and Testing of Consumer’s Installation
4 · 11 Extensions and Alterations:
4 · 12 Access to Consumer’s Premises
4 · 13 Rating of Installations
4 · 14 Generators in the consumer's installation and parallel operation with the supply system of the licensee
4 · 15 Harmonics
5 · 1 Point of Supply
5 · 2 Installation of Equipment at Point of Supply
5 · 3 Dedicated Feeder
5 · 4 Licensee's Equipment at Consumer's Premises
5 · 5 Damage to Equipment at Consumer's Premises
5 · 6 Ownership of the equipment and apparatus:
5 · 7 Failure of Fuse / Supply:
6 · 1 Change of category
6 · 2 Transfer of Connection and Mutation of Names
6 · 3 Procedure in Case of Change in Wiring and / or Apparatus or Shifting of Service Line in the Premises of the Consumer:
6 · 4 Procedure for Enhancement of Contract Demand / Connected Load
6 · 5 Procedure for Reduction of Contract Demand / Connected Load
6 · 6 Permanent Disconnection
6 · 7 Notice of Vacation or Transfer of Premises:
6 · 8 Agreement
6 · 9 Termination of Agreement
6 · 10 Security Deposit
6 · 11 Recovery of Electricity Charges
7 · 1 Installation of Meters
7 · 2 Classification of Meters, etc:
7 · 3 Supply, Installation and Ownership of Meters and Cut-outs/ MCBs / CBs
7 · 4 Testing of Meters
7 · 5 Defective Meters
7 · 6 Meter (Including Maximum Demand Indicator) Not Recording
7 · 7 Burnt Meters
7 · 8 Cost of Replacement of Defective / Burnt Meters
8 · 1 Meter Reading and Billing
8 · 2 Special Reading of Meters in cases of Change of Occupancy / Vacation of Premises for Domestic Consumers
9 · 1 Disconnection due to non-payment of bill amount
9 · 2 Disconnection on other reasons:
9 · 3 Restoration of Power Supply:
10 · 1 Unauthorized Use of Electricity
10 · 2 Authorized officer of Licensee
10 · 3 Procedure for Inspection, Provisional Assessment, Hearing and Final Assessment in case of unauthorized use of electricity
10 · 4 Theft of Electricity
10 · 5 Procedure to be adopted by licensee for Inspection, Provisional Assessment, Hearing and Final assessment in case of theft of electricity.
10 · 6 Tampering or damage to electrical plant lines or meter
10 · 7 Measures to prevent diversion of electricity, theft or unauthorized use of electricity or tampering or damage to electrical plant, electric lines or meter.
10 · 8 Voluntary Declaration of Tampered Meters
10 · 9 Assessment Bill
10 · 10 Offences and penalties in respect of supply of electricity has been dealt in detail under section 135 to 152 of the Electricity Act, 2003 as amended from time to time, which shall be binding on both the licensee and the consumer or the person concerned.
11 · 1 Force Majeure and Restrictions on Supply of Power
11 · 2 Other Codes and Regulations
11 · 3 Service of Notice
11 · 4 Terms and Conditions of Supply
11 · 5 Power to amend:
11 · 6 Power to Remove Difficulties
11 · 7 Savings
7 · Extra Load ……………………………………………………………………………………..
1 · 1 Assessment of units Consumed
1 · 2 Assessment in case of unauthorized use of electricity (UUE)
1 · 3 For cases where usage of electricity is for other purpose than authorized.