Government of Bihar,
unknown · 2003 · Bihar
Parent: The ELECTRICITY ACT, 2003 (2606b95dae11d9802fbbcf6324150adbcd1faa51)
Text
Rule TOC
1 · Preamble
2 · Legislative Framework of the Policy
3 · Scope
4 · Operative Period
1 · 1. Solar Parks
1 · 2. Other Ground Mounted
1 · 3. Elevated Solar Project
1 · 4. Floating Solar
1 · 5. Agri Voltaic Solar
1 · 6. Canal Top/Bank Solar
1 · 7. Geothermal Power Plant
1 · 8. Biomass Power Plant
1 · 9. Waste to Energy
1 · 10. Wind Power Plant
2 · Distributed RE(On-Grid)
2 · 1 Rooftop Solar
2 · 2 Small Hydro Power
2 · 3 Other Solar Power Plants
2 · 4 Solar Agriculture (Agri
2 · 5 Biomass Power Plant
2 · 6 Waste to Energy
2 · 7 Wind Power Plant
3 · Off grid RE
3 · 1 Mini and micro grids
3 · 2 DRE (Solar for
3 · 3 Standalone Solar Pumps
4 · Energy Storage (MWH)
4 · 1 Pumped Storage
4 · 2 Grid Level Battery
9 · 1 Solar PV Projects
9 · 1.1 Rooftop Solar PV Projects
9 · 1.2
9 · 1.3
9 · 2 Bioenergy/ Waste to Energy Projects
9 · 3
9 · 4
9 · 5 Pumped Storage Projects
9 · 6 Hybrid RE Projects (Solar/Wind + Other Renewable Energy technologies)
9 · 7 Other RE technologies
10 · Useful Life of RE Projects
11 · Incentives
11 · 1 Applicability
11 · 2 Electricity Duty
11 · 3 State Goods and Service Tax (SGST)
11 · 4 Open Access
11 · 5 Stamp Duty
1899 · under section 9 (1) & under section 78 of registration act 1908 in state Gazette. If any existing units
11 · 6 Free Power and Local Area Development Fund (LADF)
11 · 7 Land Conversion Charges
11 · 8 Exemption from transmission and wheeling charges
11 · 9 STU Charges
11 · 10 Banking Charges
12 · months of the year. Banking charges and other clauses will be applicable for all RE projects
11 · 11 Tariff Mechanism
11 · 12 Single Window Facility
11 · 13 Carbon Credit/Carbon Pricing
11 · 14 Deemed Industry Status
11 · 15 Promotion of setting up of RE based Electric Vehicle (EV) Charging Stations
11 · 16 Must Run Status
11 · 17 Minimum Generation Compensation
12 · Penalty for Non-compliance of Must Run Status
13 · Mandatory use of RE sources
14 · Convergence of Schemes
15 · Resource (land/Canal/reservoir/River/Rooftops etc.)
16 · Environmental Clearance
17 · Building RE Based Manufacturing Capacity
18 · Research and Development (R&D) and Stakeholders Engagement for Innovation
19 · Payment Security Mechanism (PSM)
20 · Data monitoring
21 · Transmission and Distribution Infrastructure
220 · V,1 Φ/3 Φ
7 · 100 kW
100 · kW 5000 kW
22 · Power Sale Mechanism
22 · 1 RE Power projects for Sale of Power to Discom:
22 · 2 RE Power projects under Renewable Energy Certificate (REC) Mechanism
22 · 3 Renewable Power Plants for Sale of Electricity to any entity other than the Discom (Third-Party
23 · Bihar Akshay Urja Kendra
23 · 1 Mode of Development and Management:
24 · Application Process
24 · 1 Submission of Proposal for project development
24 · 2 Application Charges
1 · MW and above
25 · Bihar Renewable Energy Development Fund (BRDF)
25 · 1 Objectives
25 · 2 Fund Creation
25 · 3 Fund Utilization Areas
25 · 4 Mode of Fund Utilization and Monitoring:
26 · Governance
26 · 1 District Level Screening Committee (DLSC)
26 · 2 State Level Screening Committee (SLSC)
26 · 3 State Level Empowered Committee (SLEC)
27 · Review of Policy
28 · Relevant Departments
1 · Department of Rural Development
29 · Power to Remove Difficulties
30 · Implementation Guidelines/Framework
10 · 07.2025