ART IIISEc 4] THE GAZETTE OF NNDLA, JUNE 26,2010 (ASADHA $, 1932) 6365 No. 12/XISTD(GRIDJIGMICEA Whereas the draft of the Central Electricity Authority (Grid Standards) Regulations, 2008 was published, as required by Sub-section (3) of Section 177 of the Electricity Act; 2003 (36 of 2003) , read with rule 3 of the Electricity (Procedure for Previous Publication) Rules, 2005; Now; therefore, in exercise of the powers conferred by sub-section (2) of Section177 read with Section 34 and clause (d) of Section 73 of the Electricity Act; 2003, the Central Electricity Authority hereby makes the following regulations, namely: Short Title, commencement and application -(1) These regulations may be 1 called the Central Electricity Authority (Grid Standards) Regulations, 2010. (2) Save as otherwise provided in these regulations, they shall come into force on the date of their publication in the Official Gazette , These regulations shall apply to the Entities, Appropriate Load Despatch (3) Centres, and, Regional Power Committees: 2 Definitions. (1) In these regulations, unless the context otherwise requires; (a) Act" means the Electricity Act, 2003; 'Appropriate Load Despatch Centre means the National Load' Despatch (b) Centre, Regional Load Despatch Centre or State Load Despatch Centre or Area Load Despatch Centre as the case may be; (c) Area Load Despatch Centre' means the centre as established by the State Transmission Utility or licensee for load"despatch and control in a particular area of the State; "Bulk consumer" means a consumer who avails supply at voltage of 33 kV or (d) above; (e "condition based maintenance' means a set of maintenance actions based on continuous or frequent assessment of equipment condition, which is obtained from either of or a combination of embedded

Rule TOC

2 · Definitions. (1) In these regulations, unless the context otherwise requires;
765 · and 400
1 · 5%
33 · t0132
765 · and 400
220 · and 132
1 · 5
1 · 0
2 · 0
1 · 5
2 · 5
2 · 0
33 · to 132
5 · 0
3 · 0
7 · _
10 · Islanding Schemes:- The Regional Power Committees shall prepare Islanding schemes for separation of systems with a view to save healthy system from total collapse in case of grid disturbance.
11 ·
13 ·
14 ·
15 · Operational Data during normal operation and during grid incidents and grid disturbances:- (1) All real time operational data as required by the Appropriate Load Despatch Center shall be furnished by the Entities.
16 ·
17 ·
18 · Safety Procedure:- (1) The Entity shall prepare contingency procedures for use of operators at each sub-station and switchyard and these shall be regularly updated: (2)AII operating personnel shall be trained in contingency procedures at regular intervals and the entities shall require their personnel to follow the contingency procedures during operation and maintenance: (3) The fire fighting equipment shall be made available at all sub-stations switchyards and converter stations and shall be checked periodically for its upkeep and mock exercises in fire fighting shall be carried out at least once in a year and record maintained:.
19 · Maintenance of Tools and Equipment - The maintenance staff shall be made aware of the list of tools, devices and equipment for various maintenance and rectification works on transmission lines, sub-stations, switchyards and converter stations and the tools shall be made readily available and certified for usage.
20 ·
21 · Hot Line Methods:- The hot line techniques for maintenance of critical transmission lines and sub-stations shall be adopted wherever possible.
22 ·
23 ·
24 ·
25 ·
26 ·
27 · .
28 ·
29 ·
30 · Residual life assessment - The residual life assessment shall be carried out for all major equipments including transformers, reactors, breakers, as envisaged by the relevant standards specified by the Bureau of Indian Standards, manufacturer's instruction or industry best practices and suitable remedial action for breach of the same shall be taken by the management of the Entity:
31 ·
32 · Maintenance records:- The records of all maintenance carried out for each equipment shall be kept in the table and formats in electronic form and hard copy
33 · Training:- (1) Every person involved in operation and maintenance of transmission lines shall be trained at the induction level and at least once in a year: