THE GAZETTE OF NNDLA, JUNE 26,2010 (ASADHA $, 1932)
regulations · 2003 · State unknown
Parent: THE ELECTRICITY ACT, 2003 (bea677da57499fcb64c52f6584daa7b9a09b875c)
Text
Rule TOC
2 · Definitions. (1) In these regulations, unless the context otherwise requires;
765 · and 400
1 · 5%
33 · t0132
765 · and 400
220 · and 132
1 · 5
1 · 0
2 · 0
1 · 5
2 · 5
2 · 0
33 · to 132
5 · 0
3 · 0
7 · _
10 · Islanding Schemes:- The Regional Power Committees shall prepare Islanding schemes for separation of systems with a view to save healthy system from total collapse in case of grid disturbance.
11 ·
13 ·
14 ·
15 · Operational Data during normal operation and during grid incidents and grid disturbances:- (1) All real time operational data as required by the Appropriate Load Despatch Center shall be furnished by the Entities.
16 ·
17 ·
18 · Safety Procedure:- (1) The Entity shall prepare contingency procedures for use of operators at each sub-station and switchyard and these shall be regularly updated: (2)AII operating personnel shall be trained in contingency procedures at regular intervals and the entities shall require their personnel to follow the contingency procedures during operation and maintenance: (3) The fire fighting equipment shall be made available at all sub-stations switchyards and converter stations and shall be checked periodically for its upkeep and mock exercises in fire fighting shall be carried out at least once in a year and record maintained:.
19 · Maintenance of Tools and Equipment - The maintenance staff shall be made aware of the list of tools, devices and equipment for various maintenance and rectification works on transmission lines, sub-stations, switchyards and converter stations and the tools shall be made readily available and certified for usage.
20 ·
21 · Hot Line Methods:- The hot line techniques for maintenance of critical transmission lines and sub-stations shall be adopted wherever possible.
22 ·
23 ·
24 ·
25 ·
26 ·
27 · .
28 ·
29 ·
30 · Residual life assessment - The residual life assessment shall be carried out for all major equipments including transformers, reactors, breakers, as envisaged by the relevant standards specified by the Bureau of Indian Standards, manufacturer's instruction or industry best practices and suitable remedial action for breach of the same shall be taken by the management of the Entity:
31 ·
32 · Maintenance records:- The records of all maintenance carried out for each equipment shall be kept in the table and formats in electronic form and hard copy
33 · Training:- (1) Every person involved in operation and maintenance of transmission lines shall be trained at the induction level and at least once in a year: