No: 16/55/2015 - RD
24fdc72a9150ec1ef52e343a057f4a83f0c17f9b · 2016 · Goa
Parent: The Goa Regularisation of Unauthorized Construction Act, 2016 (7f90c044af146f9983402496ae2b9e20cda6726e)
Text
Rule TOC
10 · The nature of land as claimed by the applicant should be decided by Authorised officer only after getting the inspection report from the team.
11 · The authorised officer may entertain any complaint however the same should be heard and disposed off summarily by giving not more than two hearings.
12 · The ceiling limits should be strictly complied with and in any case the structure should not exceed the maximum limit mentioned in the Act. Further, certain guidelines are desired to be laid down for dealing with and processing of the application to be received by the Authorised Officers, which are as under: -
10 · The Technical Team should be headed by the Mamlatdar of the concerned Taluka within whose jurisdiction the said unauthorised construction exists. The team should conduct inspection as expeditiously as possible, but in any case within a period of eight days from the receipt of the application from Authorised Officer.
11 · The team should verify as to whether the said structure comes within any of the prohibited area. It should also verify the dimensions given by the applicant in the sketch to be correct, age of the building and in general whether the structure can be considered for regularisation based on parameters envisaged in the Goa Regularisation of Unauthorised construction Act, 2016.
12 · The team incharge should submit its report to the Authorised officer within 5 days from the date of inspection.
13 · The Authorised Officer shall thereafter hold a summary inquiry to hear the applicant and objections, if any.
14 · Thereafter the Authorised officer shall pass the necessary orders either for regularisation or rejecting the application for regularisation of the said unauthorised structure.
15 · In case of acceptance of the application the applicant will be directed to deposit the entire amount as calculated based on Schedule II of the Act, and pass an Order for regularisation of structure.
16 · On 1 st of every month the Authorised Officer shall reconcile the amount so received under this Act and transfer the amount which is received pertaining to House Tax, Occupancy Fees and Construction licence fees to concerned Village Panchayat on acknowledgement from the respective Village Panchayat.